Tested and proven at LS Quarry: 43% increased tonnes per hour with XMOR

 

“If we were running the same number of trucks for a 10-hour shift, the tonnes per hour (tph) of the current bucket was 700tph while the XMOR was able to do just over 1000tph.”

Quarry Manager – LS Quarry.

Without additional machines, labour or fuel, Lima South Quarry have experienced a 43% increase in tonnes per hour output by installing an XMOR® bucket. 

Lima South Quarry, located in Victoria, produces high-grade hornfels blue metal aggregates renowned for rail ballast, concrete, asphalt and sealing applications. A key supplier to state and local governments and private road‑construction contractors, the quarry prides itself on “Superior Stone with Superior Service,” operating year‑round to meet the high demands of infrastructure schedules.

Situation

The quarry’s standard 3.5 m³ capacity excavator bucket was wearing out rapidly and struggled to keep up with the required production rate. Frequent downtime and maintenance were impacting efficiency and pushing operations into overtime.

Response

We worked closely with LS Quarry to understand the site’s main concerns and how these could be addressed with a fit for purpose bucket. Engineered with Hardox  500  Tuf wear plate and Strenx steel, the XMOR buckets lightweight, inverted tubdesign minimizes ground contact and wear, whilst also boosting payload. ONTRAC Group’s analysis predicted an extra three tonnes per swing, cutting truck‑fill cycles by 3 passes without compromising wear.

Outcome

The XMOR BHC80 high production bucket delivered a 43 % increase in tonnes per hour output by raising throughput from 700 tph to over 1,000 tph. Fewer haul trucks were needed, overtime dropped, and operators quickly adapted to the unique curved design of the XMOR bucket. Wear has remained at a satisfactory level, and ONTRAC Group’s proactive support continues to ensure peak performance.

Results

Traditional (3.5m3)XMOR (5.1m3)Difference
Tonnes per hour7001,00043% increase
Trucks per hour182539% increase
Time to fill a truck3min 20sec1min 45sec45% reduction
Passes to fill a truck8.54.533% reduction
Time to move same amount of material12 hours8 hours47% reduction

Read the full case study on Quarry Magazine → Keeping Production on track